Vision 2024-2028

Conceptual Drawing of Pure Love school

The conceptual drawing above illustrates both pure love school Outdoor Swimming Pool, Outdoor BasketBall coart and football groung. It is our first major building initiative. A capital campaign is currently underway to begin the funding of this school. If you would like more information about how you can help, please contact:

We envisage a large resource centre on 30 acres of land with a vocational training centre, a recreation centre, a computer laboratory, a library, commercial accommodation facilities for income and a larger children’s home with a farm for agriculture and a chapel for worship. If funds suffice we could even attach a health centre to serve the surrounding community.

Vision 2024-2028

PARTNER WITH US TO MAKE THIS DREAM COME TRUE

This time round however, we are dreaming bigger and the dream is for this children’s program to take a big leap beyond just basic support and education, to a community empowerment program where our children will learn to work independently and survive confortably after school. We believe that our children will graduate and train the community in the very skills they have acquired from PLUG. It is with this passion that I present my plea.

I fore-see self-sustaining program that after the onset can replenish itself, and empower the children and as a result the community. We desire to expand our home to accommodate needier children, not only those around the central city of Kampala, but also those from the more rural districts.

We envisage a large resource centre on 30 acres of land with a vocational training centre, a recreation centre, a computer laboratory, a library, commercial accommodation facilities for income and a larger children’s home with a farm for agriculture and a chapel for worship. If funds suffice we could even attach a health centre to serve the surrounding community.

We will appreciate every assistance both financial and professional input, to bring this gigantic dream to life! It is a life-saving dream which we desperately need to bring into reality.

Vision 2024-2028

GROUND FLOOR

Process: Arranging to start construction for Plug. Below is the process followed before construction of any building starts Storied structures require Three (3) sets of drawings

YOUR PARTNERSHIP MEANS MUCH TO US

  • 1. Architectural drawings
  • 2. Structural drawings
  • 3. Mechanical and Electrical drawings

All these drawings are done by Three (3) different professionals.

  • 1. The Architect
  • 2. Structural Engineer
  • 3. Mechanical or Electrical Engineer

Respectively. All these drawings need to be taken to the Area district where the project is to be done for Approval. The approval process may take between 2 to 4 months and during this period, an inspection to the site is carried out to ascertain that the site is fit to receive the proposed structure. At each stage, there are charges associated with it as seen in the quotation attached. After the committee at the district headquarters has sat and approved your drawings, then construction can start. It should be noted that without these drawings, construction cannot take place and it’s also not possible to accurately estimate the cost of the project. Therefore, it’s from these drawings that the Quantity Surveyor picks detailed information about the components that the structure is made of so as to produce a Bill of Quantities (BOQ). The Bill of Quantities document shows the cost of the project from start to finish and it also shows all the necessary work and materials that have to be used in order to have the structure as it is in the Architectural Designs, Structural Designs, Mechanical and Electrical Designs.